1 |
G |
Does the Project have all the required permits and
licenses to operate and ensures compliance with local and
(when applicable) international law?
|
|
|
|
2 |
G |
Have local and relevant stakeholders been identified and
involved in the design / construction of the Project AND
have affected communities been consulted, obtaining their
Free Prior and Informed Consent (FPIC)?
|
|
|
|
3 |
G |
Has the Projected implemented concrete resilience measures
to improve resilience against shocks, stresses and
catastrophes? (e.g. sufficiently redundancy, disaster risk
reduction, identified (water or other stresses) AND
prepared for them?
|
|
|
|
4 |
G |
Has the Project committed to sustainability management,
carried out an Environmental Impact Assessment AND
maintains an Environmental and Social Management System?
|
|
|
|
5 |
G |
Does the Project implement an anticorruption policy, which
promotes anti-bribery, public disclosure and necessitates
risk assessment of involvement with Politically Exposed
Persons (PEPs)?
|
|
|
|
6 |
S |
Does the Project make a publicly documented commitment to
human rights AND discloses information on this topic?
|
|
|
|
7 |
S |
Does the Project have and implement a transparent gender
equality and non-discrimination employment policy? (e.g.
by having fair wages, an accessible grievance mechanism,
women's empowerment measures).
|
|
|
|
8 |
S |
Does the Project have AND implement an Occupational Health
and Safety policy? (including but not limited to: hazard
identification, control measures, training of the
workforce, safety guidelines).
|
|
|
|
9 |
S |
Does the Project ensures that no forced or child labour is
involved in its operations and those of its Direct
Suppliers and Contractors?
|
|
|
|
10 |
S |
Does the Project support local skill and capacity transfer
and development (i.e. through hiring local staff, training
the community)?
|
|
|
|
11 |
E |
Has the Project conducted a health and safety risk
assessment to ensure emergency preparedness throughout the
life cycle of the project, including decommissioning?
|
|
|
|
12 |
E |
Are the Project's Greenhouse Gas Emissions (GHG) aligned
with the national emission reduction targets of the
country where it operates?
|
|
|
|
13 |
E |
Is the Project Carbon neutral? |
|
|
|
14 |
E |
Does the Project monitor, report on project-related
impacts to biodiversity and ecosystems AND implements
measures to avoid or minimize them?
|
|
|
|
15 |
E |
Does the Project assess/report and monitor resource
consumption (energy, water) AND implement measures to
improvement of resource consumption over time?
|
|
|
|
16 |
E |
Is the Project site located on at least 75% of grey or
brown-field land?
|
|
|
|
17 |
E |
Does the Project have NO net negative impacts on water
sources (regarding volume and/or quality)?
|
|
|
|
18 |
E |
Does the Project avoid, minimize, recycle or re-use at
least 50% of all waste generated and disposes of 100% of
its waste in a safe manner?
|
|
|
|